1783
Brought up£40..11S..8D
March 29
fixing a Lead pipe from water Tub to old pipe of men & womans Yard
fixing a Lead Pipe from wood Tree to governors water tub makeing a Cross
Joint from do. to pipe that Leads. to water Cockin Yard fixing Lead pipe
from governors water tub to sink in Kitchen of governors house 41 ft of ¾ pipe
12 Joints. to do. 2 Cock Cementd.
in 1 stop Cock 1-¾ Cock ball & boss 1-10 great
Cock & boss 1 water Cock to Tubs in Yard
4 Straps
. of Lead &
[..] to held up pipe
in Governor house 6 Wall hooks 39
[..] ralls & Coals to heat motth fixing up the
Lead pipe fixing ferralls in tubs & fastening up Cock 2 men ½ day}
4..6..9
31
Cutting off the old Lead pipe & Takeing it up 2 men ¼ day do. Liongthing the old
Pipe that Leads. from the wood Freetes between Two first Gates to the Govern
orshouse to water Cook between gates 2 ft 8 ¾ pipe 2 Joints 1 ferralt}
0..9..6
April 2d.
7th
Sherling the water pipes. in men & womans Yard new Liather in a bucket
to womans pump & work to old pipe
[..] thing on a Cock 2¾ Joint ¼ day}
0..8..9
9th.
2 ft 3 of ¼ Pipe to lead the water into Tub at Tap
& something on a Cock
2 Joint to 10 great Cock boss & ball ¼ day 2 men}
0..15..8¼
11
&
12
takeing up the old led pipe that Lead from the well on the mens side to the
womans Pumps & Takeing down the Pump & refixing do. & Laying down
new led Pipe 20 ft of 1¼ Pump pipe 4 Joints fresh setting a sucker Fasten
ing a buckett 1 day 4 men ¾ day 2 men}
2..10..8
19 & 24th.
11th Cast Lead to cover Locks. 1 new Clack to bucketts sucker ¼ day men0..3.9½
May 21st
long thening 2 Pipes to Lead into middle water Tub between gates
opening Ground & filling in do. & fixing in a Communication pipe
2 ft of ¾ Pipe 2 Joints. 1 ft 6 of 1½ pipe 16th of Cast Lead 4th sodder 36½ 4d Clout ¾ day
2. men}
0..19..9
July 1st..
a 3in ducker to Pump & makeing Pump to work Lingthening the Pipe
in the well
[..] the men & womans Pump 5 ft of 2s Pipe 8 ft of 1¼ do.}
Carried. up£50..6..6¾